Pod Lifting System (one over two)
Supplied using our off-the-shelf modular spreader beams, the beams can be supplied next day and the rigging within 3-4 days. A suitable solution if time is tight and there are no headroom restrictions. A rigging plan and drawings can be produced.
Pod Lifting System (one over two) from Britlift
Looking for something different?
Britlift can design and manufacture any below-the-hook lifting system to suit any application and environment. If you have a 2 point lift and no height restrictions then maybe its a spreader beam you need? Visit the products page (above) and click on spreader beams.
Advanced quality documentation and packs also available, including calculations reports, bespoke testing/welding and third party witnessing.